欢迎您访问山东三所新材料技术有限公司网站!
当前位置:首页>新闻中心-行业新闻伪装网的阻燃性能有哪些特点?
伪装网的阻燃性能有哪些特点?
来源:http://www.csdssc.com/ 发布时间:2023-07-11 0
一、现场勘测
1、 Site survey
现场勘测是建造和安装仿木护栏之前的一个重要步骤,因为未来的工作将以此为基础,作为建造和安装的标准。在勘察现场,应注意观察基础结构、承重和现场施工及周边建筑物。
The on-site survey is an important step before constructing and installing the imitation wooden guardrail, as future work will use it as a basis and as a standard for construction and installation. At the survey site, attention should be paid to observing the foundation structure, load-bearing capacity, on-site construction, and surrounding buildings.
二、材料检测
2、 Material testing
检查并检查运输到施工现场的木栏杆柱、分离柱和横梁的构件是否变形,检查运输和堆放过程中的构件是否变形,并检查仿木栏杆的外形尺寸是否有误,并查看仿木护栏的外观是否有裂痕等现象。
Inspect and inspect the components of wooden railing columns, separation columns, and crossbeams transported to the construction site for deformation, inspect the components during transportation and stacking for deformation, and inspect the overall dimensions of the imitation wooden railing for errors, as well as inspect the appearance of the imitation wooden railing for cracks and other phenomena.
伪装网
三、技术交底
3、 Technical disclosure
总的原则是,施工方技术交底,按照合同所有者或甲方的要求,由党的建设提出的组织计划进行了较为和深入的沟通和交流。因此,业主或甲方的要求,充分体现在安装施工,产品符合设计要求和一致性的影响终效果。根据技术测试的设计要求,检查木栏杆基础设施的要求,不符合要求的,责令整改。基础可以由甲方来处理,施工负责技术测试。制作安装基础,基座应该保证的95%或更多的平坦度的产量,为柱或通过其它方便的方法安装的嵌入式预成形的孔。
The general principle is that the technical disclosure of the construction party has been carried out in accordance with the requirements of the contract owner or party A, and the organizational plan proposed by the party building has been comprehensively and deeply communicated and communicated. Therefore, the requirements of the owner or party A are fully reflected in the installation and construction, and the impact of product compliance with design requirements and consistency on the final effect. According to the design requirements of technical testing, check the requirements of the wooden railing infrastructure. If it does not meet the requirements, order rectification. The foundation can be handled by Party A, and the construction is responsible for technical testing. The production of installation foundation and base should ensure a flatness of 95% or more, with embedded preformed holes installed for columns or other convenient methods.
四、施工组织
4、 Construction organization
施工过程中应注意的具体问题,由现场施工人员详细讲解,使每一名施工人员都熟悉,保证安装的进度和效果。
The specific issues that should be paid attention to during the construction process will be explained in detail by the on-site construction personnel, so that every construction personnel is familiar with it and ensure the progress and effectiveness of installation.
分类中心

Product

联系我们
山东三所新材料技术有限公司 山东三所新材料技术有限公司

联系电话:13053722248

联系地址:山东省济宁市任城区美恒济宁国际汽车博览城4号楼2单元0507号